Glas Civil Engineering Ltd are continuing works on the Royal Canal Greenway scheme from Louisa Bridge, Leixlip to Maynooth Harbour.
As part of this scheme, the following works are ongoing:
- Upgrade works will be commencing on the R148 between Pike Bridge and Deey Bridge from Thursday 19 September, Traffic management will be in place for a period for these works.
- Further upgrade works will be carried out on the R148 at Louisa Bridge from Friday 20 of September. Traffic management with a periodic stop/go shuttle system will be in place for a period for these works.
General arrangement drawings for the scheme can be viewed at the following link: https://kildarecoco.ie/AllServices/Transport/RoadSafetyCyclingandSustainableTransport/SustainableTransport/SustainableInfrastructureProjects/RoyalCanalGreenway-MaynoothtoConfey/
Kildare County Council apologises for any inconvenience.