Glas Civil Engineering Ltd are continuing works on the Royal Canal Greenway scheme from Louisa Bridge, Leixlip to Maynooth Harbour.
As part of this scheme, the following works are ongoing:
- Section of the towpath/greenway from R406 Straffan Road, Maynooth to Pike Bridge remains closed for upgrade works.
- Upgrade works are continuing on the R148 Road between Pike Bridge and Deey Bridge (Blakestown). A localised road narrowing traffic management layout and a road works speed limit reduction (from 80km/hr to 50km/hr) will be in place for the Christmas period (between 20 December 2024 and 6 January 2025).
General arrangement drawings for the scheme can be viewed at the following link: https://kildarecoco.ie/AllServices/Transport/RoadSafetyCyclingandSustainableTransport/SustainableTransport/SustainableInfrastructureProjects/RoyalCanalGreenway-MaynoothtoConfey/
Kildare County Council apologises for any inconvenience.