Glas Civil Engineering Ltd are continuing works on the Royal Canal Greenway scheme from Louisa Bridge, Leixlip to Maynooth Harbour.
As part of this scheme, the following works are ongoing:
- Section of the towpath/greenway from R406 Straffan Road, Maynooth to Pike Bridge is closed for upgrade works.
- Section of the towpath/greenway from Pike Bridge to Deey Bridge (Blakestown) is closed for upgrade works.
- Upgrade works are continuing on the R148 Road between Pike Bridge and Deey Bridge (Blakestown). Various traffic management layouts including a stop/go shuttle system and a road works speed limit reduction (from 80km/hr to 50km/hr) are in place for these works.
General arrangement drawings for the scheme can be viewed at the following link: https://kildarecoco.ie/AllServices/Transport/RoadSafetyCyclingandSustainableTransport/SustainableTransport/SustainableInfrastructureProjects/RoyalCanalGreenway-MaynoothtoConfey/
Kildare County Council apologises for any inconvenience.